workflow

Incident Response Readiness Program

Standing operator workflow that runs against the EXISTING incident-response Control item — UC-IR-01 (domains=incident_management_response, frequency=annual) — with the training-and-testing Control UC-IR-02 linked to the same instance; both carry framework=[nist-800-53, iso-27001], and those governing standards drive the plan's required elements. It maintains and approves the written IR plan (a Policy item, policy_type=procedure, framework=[nist-800-53, iso-27001], review_frequency=annual, whose governed redline attaches to the item), distributes and protects it to named responders, delivers role-based training, runs the scheduled capability test (an Audit item, audit_type=readiness, linked back to the two Controls), and feeds exercise and training gaps back into the plan and training program as corrective-action Issue items (source=self_assessment). Named deliverables: the redlined IR plan on its Policy item, the exercise after-action report, the IR readiness dashboard, and the routed corrective-action register (Issue items). In scope: the IR plan's required elements (mission and scope, incident definitions and severity structure, roles and responsibilities, communication paths, and business-continuity/third-party coordination), the named-responder and leadership training population, and the scheduled capability test. Out of scope: live incident handling itself — this workflow builds and tests readiness, it does not run the response to an active incident. It runs on an annual cadence and off-cycle whenever a significant incident or a material organizational/system change occurs; no upstream workflow feeds it and it hands off to no downstream workflow — identified gaps re-enter this same workflow as corrective-action Issues.

In catalog since 2026-09-17T22:28:00Z · Last changed 2026-10-04T21:48:26Z (791ff2dd3a45)

Record JSON · Open in map · Data retrieval guide

Catalog revision: 791ff2dd3a45707290badee660f185e514d15f1cf518908628f425c2f2c56ee4. A connection does not establish full coverage.

Attributes

domain
controls
department
it
lineOfDefense
operate

Details

teams
  • it
domains
  • controls
standards
  • nist-800-53
  • iso-27001
sourceTemplateId
workflow-library:controls-incident-response-readiness-program
releaseId
sha256:5b3ffa8a2a8c0580c52dac577098bb32aa2279287aabe19d6d03befde2314c09
canonicalUrl
https://evidenceflows.com/workflows/all/?w=controls-incident-response-readiness-program
capabilities
    mappingStatus
    mapped
    lineOfDefense
    operate
    controls
    • UC-IR-01
    • UC-IR-02
    roleIntegrity
    activityCount
    0
    ermPhases
      lineRoles
        serviceModes
          warnings

            Source

            No record-specific source URL is provided.

            Download workflow template · Release: sha256:5b3ffa8a2a8c0580c52dac577098bb32aa2279287aabe19d6d03befde2314c09

            Connections